Case 1:
	Project name: the paper to constant temperature and humidity chamber
	The construction unit: one entry and exit inspection and quarantine bureau
	The project content: the constant temperature and humidity laboratory construction and laboratory other form a complete set of equipment, construction as a whole.
	Project status: laboratory, with a total area of about 86 m2, height 2.6 meters, temperature of 23 + / - 1 ℃ : humidity 50 + / - 2% RH.
	Laboratory layout:
	Case 2:
	The construction unit: an enterprise textile testing laboratory
	The project content: the constant temperature and humidity laboratory construction and laboratory other form a complete set of equipment, construction as a whole.
	Project status: laboratory, with a total area of about 50 m2, the height 2.6 meters, 20 + / - 1 ℃ temperature: humidity 65 + / - 2% RH.
	Laboratory layout: