Eight steps of purification construction in ED laboratory
Release time:2020-01-02 source:
The construction of the laboratory is different from the ordinary industrial and civil buildings. The air conditioning and clean workshop are generally undertaken by professional companies. The purification laboratory partition wall, ceiling and other professional companies carry out the secondary in-depth design according to the original design blueprint and the requirements of the construction unit. The design unit, the construction unit, the construction unit and the relevant supervision unit are reviewed and approved by the original design unit. The parameters of purification air conditioning in ED laboratory are required to be high, and the professional company also carries out the secondary in-depth design, so as to pass the review of the supervision unit. The design concept of the supervising engineer should not only stay in supervising the construction unit's drawing construction, which requires the supervising engineer to master the key points of construction process quality control, and strictly check the acceptance procedures of Inner Mongolia laboratory purification company. At the same time, ED laboratory purification company summed up the following experience from the past engineering construction experience, which is also the common construction steps of professional laboratory purification company:
ED laboratory purification company
The first step is that the air duct material shall meet the design requirements, and the raw material degreasing process shall be fully inspected.
In the second step, the air duct prefabrication mainly controls whether the manufacturing environment meets the requirements and whether the specified process meets the design requirements.
The third step, the sealing control, flange and fastener in the installation process shall meet the specification requirements.
The fourth step is to disconnect the air duct system and test the air leakage.
Step 5: in addition to checking the flatness and verticality of the wall panels in the laboratory, ED laboratory purification company mainly controls the sealing conditions, including the sealing of doors and windows, the sealing of water and electrical holes, and the surface cleaning, which shall be wiped with non falling fiber fabric.
The sixth step, cross construction, mainly artesian construction, the laboratory must prevent the secondary pollution in the construction process. For the construction of artesian floor, there is a process of grinding the floor, and the grinder with its own dust suction device shall be used. The construction of the surface layer of the Ziliuping ground should grasp the opportunity, and it is easy to cause damage if the cross construction is done early. In particular, a large number of harmful gases are generated from the floor construction, which cannot be discharged. At this time, ED laboratory purification company suggests that the air return outlet should be closed to use the positive pressure of the fresh air of the air conditioner for forced exhaust, and the fresh air outlet should be additionally equipped with a filter.
ED laboratory purification company
The seventh step is to install the high efficiency filter. Before installation, the air pipe should be blown first, and the filter must be tested for leakage. Inner Mongolia laboratory purification company suggests to conduct comprehensive inspection when necessary, which is the key process to ensure the cleanliness. The installation process shall meet the specification requirements.
The eighth step is to strictly control the flow of personnel, the moving of tools and instruments and the dressing of operators during the purification construction of ED laboratory.
Shandong ed purification Engineering Co., Ltd. is a professional manufacturer of laboratory planning and design. It has been engaged in laboratory purification decoration, laboratory purification design, laboratory purification transformation and other businesses for many years. The company has a professional laboratory purification design team, covering the laboratory purification decoration construction team. Construction of clean laboratory, design of clean laboratory, decoration of clean laboratory, planning of clean laboratory, seeking for purification. For more laboratory knowledge, please pay attention to WeChat public address: Aide-188 (Ed purified oxygen supply).